First Private Brewery Lviv, LLC
First Private Brewery Lviv, LLC

Created both an engineering design and a construction project
Delivered the equipment
Completed as general contractor full scope of construction works
Assembled an equipment and engineering lines

read more
Dinter Ukraine Skala, SC, Skala-Podilska urban-type settlement, Ternopil region
Dinter Ukraine Skala, SC, Skala-Podilska urban-type settlement, Ternopil region

Customer – Dinter Ukraine Skala, SC Project name – treatment facilities with biogas production Location – Skala-Podilska urban-type settlement, Ternopil region Status – The construction phase 1 is completed. physical-chemical pretreatment. Details of treatment facilities –1 000 м3/24h. The 2nd stage of anaerobic wastewater treatment in the UASB-type anaerobic reactor

read more
Wartkowice Municipal Wastewater Treatment Facilities Administration
Wartkowice Municipal Wastewater Treatment Facilities Administration

Wartkowice Municipal Wastewater Treatment Facilities Administration, the Republic of Poland Description: Municipal wastewater treatment facilities retrofit, replacement of dewatering and sludge conveyance equipment, installation of automation system Location: Wartkowicy, the Republic of Poland Year of accomplishment: 2016

read more
Frito-Lay Poland Sp. z o.o.
Frito-Lay Poland Sp. z o.o.

Customer: Frito-Lay Poland Sp. z o.o. Industry: potato crisps and snack Project name: Regeneration of anaerobic technology with physical-chemical method (flotation), installation of nitrogen ammonification reactor, elimination of improper smells with biofilters Location: the city of Grodzisk Mazowiecki, the Republic of Poland Year of accomplishment: 2017

read more
Pepsi-Cola Sp. z o.o. General Bottlers Poland
Pepsi-Cola Sp. z o.o. General Bottlers Poland

Customer: Pepsi-Cola Sp. z o.o. General Bottlers Poland, 48 668 78 00 Industry: soft drink manufacture Project name: Existing treatment facilities aeration system retrofit, the increase of productive capacity from 750 m3/24h to 1000 m3/24h by implementation of S – Select system Location – the town of Michr?w, the Republic of Poland. Year of accomplishment: […]

read more
Pfeifer & Langen
Pfeifer & Langen

Customer – Pfeifer & Langen Project name – treatment facilities with a biogas plant for agriculture company Location – the Republic of Poland, town of Glinojeck Year of accomplishment – completed in 2013 Description – Biogas plant with a capacity of 1,56 MW using sugar beet pulp. Post-fermentation refining in existing treatment facilities

read more
Szczawnica Municipal Wastewater Treatment Facilities Administration
Szczawnica Municipal Wastewater Treatment Facilities Administration

Customer: Szczawnica Municipal Wastewater Treatment Facilities Administration, the Republic of Poland Description: Municipal wastewater treatment facilities retrofit, replacement of processing units and increase of productive treatment capacity up to 2700m3/24h Location: Szczawnicy, the Republic of Poland Year of accomplishment: 2015

read more